Skip to main content

VCE General Mathematics exam 2026Exams: Fri 30 Oct to Mon 2 Nov · VCAA timetable

Your VCE General Mathematics exam:

When and how long

  • General Mathematics · Examination 12.00 pm to 3.45 pm1 h 30 min plus 15 min reading time
  • General Mathematics · Examination 22.00 pm to 3.45 pm1 h 30 min plus 15 min reading time

VCAA: the reading period is included in the times shown, and each examination starts with a 15-minute reading period unless otherwise specified. Arrive at least 30 minutes before the start time. A few language exams run earlier in October.

Source: 2026 VCE examination timetable (VCAA), checked Wednesday 23 September 2026. Where a start time, reading time or duration isn't shown, the timetable doesn't publish it: check your personal timetable and the front of your paper.

Most-examined dot points

Dot points where we reproduce real past VCAA exam questions. This shows where real questions have landed, not how often each topic is examined.

Night-before and exam-morning checklists

The night before

  • Check the start time of each exam; the 15-minute reading period is included in the timetable times.[2]
  • Pack a transparent pencil case: pens, pencils, highlighters, erasers, sharpener and a ruler.[1]
  • Pack your approved calculator and spare batteries (CAS only where allowed: General Maths, Methods Exam 2, Specialist Exam 2).[1]
  • Still water in a clear plastic bottle, labels removed, no more than 1500 mL (it stays off your table).[1]
  • Stop revising around 8 pm, set two alarms and sleep.[1]

Exam morning

  • Eat a real breakfast.[1]
  • Arrive at least 30 minutes before the start time.[2]
  • If you are up to 30 minutes late you still get full writing time, but no reading time.[1]
  • Leave phones, smart watches and fitness trackers outside the exam room.[1]
  • In reading time: read and plan, but don't write or use your calculator.[1]
  • You can't leave before 30 minutes of writing time or in the last 5 minutes.[1]
  1. VCE exam day: what to actually expect
  2. VCAA: VCE examination timetable

Exam-week survival kit: The last 7 days · The night before and exam morning · What to bring, and what's banned · How to use reading time · If you're sick or something goes wrong · Handling exam-week stress.

Last-week revision

Syllabus by module

VCE General Mathematics cram sheet

Key formulas, definitions and facts copied from our General Mathematics syllabus pages. One page when printed.

Unit 3 Data analysis

For an approximately symmetric distribution with no outliers, summarise with the mean and standard deviation. For a skewed distribution or one with outliers, use the median and IQR, because they are resistant to extreme values. Always give values with units, and only round when told to.

From: Summary statistics

Seasonal index =value for the seasonseasonal average= \dfrac{\text{value for the season}}{\text{seasonal average}}; indices sum to the number of seasons. Deseasonalised =actualseasonal index= \dfrac{\text{actual}}{\text{seasonal index}}. Actual == deseasonalised ×\times seasonal index. Deseasonalising multiplies a value by 1index\dfrac{1}{\text{index}}.

From: Seasonal indices and deseasonalisation

A logarithmic (base 10) scale is an axis on which equal distances represent equal multiplications by ten (or equal ratios), rather than equal additions. Each whole unit on the scale is a power of ten: 1 is 1010, 2 is 100100, 3 is 10001000, and so on.

From: Logarithmic (base 10) scales for VCE General Mathematics Unit 3 Data analysis

Residual == actual −- predicted. For a least squares line the residuals always sum to zero, so a residual plot is always centred on the horizontal axis. A random residual plot supports a linear model; a clear pattern (especially a curve) means the association is non-linear, whatever the value of r2r^2.

From: Residuals and residual analysis for VCE General Mathematics Unit 3 Data analysis

Unit 4 Matrices

PSPS: a 1 in row ii, column jj puts element jj into position ii. Diagonal 1s mean "stays in place". P−1=PTP^{-1} = P^T. With Sn+1=PSnS_{n+1} = PS_n: Sn=PnS0S_n = P^nS_0. If Pn=IP^n = I the order repeats every nn steps, and the smallest such nn is the LCM of the cycle lengths.

From: Permutation and binary matrices

Sum of degrees =2×= 2 \times number of edges. Connected graph: all degrees even ⇒\Rightarrow Eulerian circuit; exactly two odd ⇒\Rightarrow Eulerian trail between them; more than two odd ⇒\Rightarrow neither.

From: Euler and Hamilton paths and circuits

Path capacity == the smallest capacity on the path. Cut capacity == sum of capacities of edges from the source side to the sink side (ignore edges pointing back). Any flow ≤\le any cut. Maximum flow == minimum cut capacity.

From: Maximum flow and minimum cut

Earliest finish == EST ++ duration. EST =max⁡= \max(earliest finish of immediate predecessors). LST =min⁡= \min(LST of immediate successors) −- duration. Float == LST −- EST. Critical activities have float 00; the critical path is the longest path, and its length is the minimum completion time.

From: Critical path analysis, dummy activities and crashing