VCE General Mathematics exam 2026Exams: Fri 30 Oct to Mon 2 Nov · VCAA timetable
Your VCE General Mathematics exam:
When and how long
- General Mathematics · Examination 12.00 pm to 3.45 pm1 h 30 min plus 15 min reading time
- General Mathematics · Examination 22.00 pm to 3.45 pm1 h 30 min plus 15 min reading time
VCAA: the reading period is included in the times shown, and each examination starts with a 15-minute reading period unless otherwise specified. Arrive at least 30 minutes before the start time. A few language exams run earlier in October.
Source: 2026 VCE examination timetable (VCAA), checked Wednesday 23 September 2026. Where a start time, reading time or duration isn't shown, the timetable doesn't publish it: check your personal timetable and the front of your paper.
Most-examined dot points
Dot points where we reproduce real past VCAA exam questions. This shows where real questions have landed, not how often each topic is examined.
- Correlation and least-squares regressionReal VCE questions from 2023, 2025
- Time series and trendsReal VCE questions from 2023, 2025
- Graphs, trees and shortest pathReal VCE questions from 2023, 2025
- Seasonal indices and deseasonalisationReal VCE questions from 2023, 2025
- Boxplots and the five-number summaryReal VCE questions from 2023, 2025
- Communication and dominance matricesReal VCE questions from 2023, 2025
- Data transformation to lineariseReal VCE questions from 2023, 2025
- Euler and Hamilton paths and circuitsReal VCE questions from 2023, 2025
Night-before and exam-morning checklists
The night before
- Check the start time of each exam; the 15-minute reading period is included in the timetable times.[2]
- Pack a transparent pencil case: pens, pencils, highlighters, erasers, sharpener and a ruler.[1]
- Pack your approved calculator and spare batteries (CAS only where allowed: General Maths, Methods Exam 2, Specialist Exam 2).[1]
- Still water in a clear plastic bottle, labels removed, no more than 1500 mL (it stays off your table).[1]
- Stop revising around 8 pm, set two alarms and sleep.[1]
Exam morning
- Eat a real breakfast.[1]
- Arrive at least 30 minutes before the start time.[2]
- If you are up to 30 minutes late you still get full writing time, but no reading time.[1]
- Leave phones, smart watches and fitness trackers outside the exam room.[1]
- In reading time: read and plan, but don't write or use your calculator.[1]
- You can't leave before 30 minutes of writing time or in the last 5 minutes.[1]
Exam-week survival kit: The last 7 days · The night before and exam morning · What to bring, and what's banned · How to use reading time · If you're sick or something goes wrong · Handling exam-week stress.
Last-week revision
- 2025 past paperWalkthrough, with a link to the official VCAA paper
- 2025 past paperWalkthrough, with a link to the official VCAA paper
- 2024 past paperWalkthrough, with a link to the official VCAA paper
- 2024 past paperWalkthrough, with a link to the official VCAA paper
- FlashcardsSpaced-repetition cards from the syllabus pages
Syllabus by module
VCE General Mathematics cram sheet
Key formulas, definitions and facts copied from our General Mathematics syllabus pages. One page when printed.
Unit 3 Data analysis
For an approximately symmetric distribution with no outliers, summarise with the mean and standard deviation. For a skewed distribution or one with outliers, use the median and IQR, because they are resistant to extreme values. Always give values with units, and only round when told to.
Seasonal index ; indices sum to the number of seasons. Deseasonalised . Actual deseasonalised seasonal index. Deseasonalising multiplies a value by .
A logarithmic (base 10) scale is an axis on which equal distances represent equal multiplications by ten (or equal ratios), rather than equal additions. Each whole unit on the scale is a power of ten: 1 is , 2 is , 3 is , and so on.
Residual actual predicted. For a least squares line the residuals always sum to zero, so a residual plot is always centred on the horizontal axis. A random residual plot supports a linear model; a clear pattern (especially a curve) means the association is non-linear, whatever the value of .
Unit 4 Matrices
: a 1 in row , column puts element into position . Diagonal 1s mean "stays in place". . With : . If the order repeats every steps, and the smallest such is the LCM of the cycle lengths.
Sum of degrees number of edges. Connected graph: all degrees even Eulerian circuit; exactly two odd Eulerian trail between them; more than two odd neither.
Path capacity the smallest capacity on the path. Cut capacity sum of capacities of edges from the source side to the sink side (ignore edges pointing back). Any flow any cut. Maximum flow minimum cut capacity.
Earliest finish EST duration. EST (earliest finish of immediate predecessors). LST (LST of immediate successors) duration. Float LST EST. Critical activities have float ; the critical path is the longest path, and its length is the minimum completion time.