What is the work plan?
Show answer
A work plan is the production roadmap. It breaks manufacture into ordered steps and, for each, states the tools and equipment, the materials, the estimated time, the quality measures and the safety controls. A thorough plan lets you work efficiently and proves you understood the sequence before you started cutting.
What is quality measures during production?
Show answer
Quality is checked throughout, not just at the end. Quality measures are the specific checks (a dimension, a fit, a finish standard) you apply at each step to catch problems early. Recording these checks in your folio shows you controlled quality actively rather than hoping for the best.